This site uses cookies for analytics and to improve your experience. By clicking Accept, you consent to our use of cookies. Learn more in our privacy policy.

Skip to content
uMCAD

Preferred 3D design source

Cart total: $0.00
Menu
  •  3D Mall
    • SolidWorks
    • Inventor
    • CREO
    • SketchUp
    • UG
    • AutoCAD
  •  Blog
    • Design
      • UI Design
    • Technology
      • Mechanical
      • Electrical
      • Automation
  •  Checkout
    • Order History
    • Transaction Failed
  • MathNotes
  • Easynotifyforward
  • Log In
    • Register
    • Edit User Profile

Work Order: Pneumatic Fixture Clamping Force Verification on the Drill Cell

JUMI 2026-09-112026-09-19 Technology  fixture clamp force calculation, machining fixture troubleshooting, pneumatic fixture clamping force

WORK ORDER — Maintenance and Improvement Record Work order no: WO-A-2026-01    Date issued: 2026-09-11    Category: Pneumatic fixture Machine / cell: Drill Cell DC-4, vertical drilling station    Status: Closed Engineer: J. Radek (fixtures…

Continue reading →

Work Log: Hydraulic Circuit Leak Hunt on the Injection Press

JUMI 2026-09-112026-09-19 Technology  hydraulic cylinder slow movement troubleshooting, hydraulic leak detection procedure, hydraulic return filter maintenance

Work log — injection moulding shop, hydraulic leak hunt week Engineer: M. Okafor (fluid power) Project: IM-4 320 tonne injection press hydraulic station Log period: Day 01 to Day 06 Document ref: WL-2026-0911-SL10 Day 01…

Continue reading →

Work Log: Seal Selection and Groove Design on the Mixing Vessel

JUMI 2026-09-112026-09-19 Technology  mechanical seal selection guide, O-Ring Groove Design, packing gland refurbishment procedure

Work log — Process plant, seal selection and groove design week Engineer: K. Yarrow (static equipment) Project: MV-9 mixing vessel agitator shaft seal Log period: Day 01 to Day 06 Document ref: WL-2026-0911-SL09 Day 01…

Continue reading →

Work Log: Lube Interval and Oil Selection on the Press Line

JUMI 2026-09-112026-09-19 Technology  bearing lubrication audit procedure, grease selection for press machines, lubrication interval optimization

Work log — Press shop, lube interval and oil selection week Engineer: R. Suto (plant lubrication) Project: PL-4 press line, straight-side 400-tonne press and feed system Log period: Week 01 to Week 02 Document ref:…

Continue reading →

Work Log: Spindle Bearing Preload Tuning on the Glaze Pump

JUMI 2026-09-112026-09-19 Technology  bearing cage wear diagnosis, bearing preload tuning method, machine tool spindle bearing

Work log — Glaze pump project, spindle bearing preload week Engineer: M. Ibera (rotating machinery) Project: GP-15 ceramic glaze pump, 15 kW direct-drive spindle Log period: Day 01 to Day 05 Document ref: WL-2026-0911-BP07 Day…

Continue reading →

Work Log: Gear Backlash Control on the Four-Bar Indexer

JUMI 2026-09-112026-09-19 Technology  gear backlash control, gear center distance measurement, preloaded gear pair setup

Work log — Indexer project, gear backlash control week Engineer: T. Nowak (precision mechanisms) Project: FBL-4 four-bar rotary indexer, cam and gear-blended drive Log period: Day 01 to Day 06 Document ref: WL-2026-0911-BK06 Day 01…

Continue reading →

Work Log: Rotary Table Accuracy Calibration on the HMC

JUMI 2026-09-112026-09-19 Technology  4th axis indexing error correction, rotary axis pitch error compensation, rotary table accuracy calibration

Work log — Machine tool project, rotary table calibration week Engineer: H. Gallo (machine tool metrology) Project: HMC-610 machining centre, 4th axis rotary table Log period: Day 01 to Day 06 Document ref: WL-2026-0911-RT05 Day…

Continue reading →

Work Log: Vision Positioning and the Mechanical Datum Handshake on the Assembly Cell

JUMI 2026-09-112026-09-19 Technology  camera to robot calibration, hand eye calibration accuracy, vision positioning mechanical datum

Work log — Assembly cell project, vision-to-machine datum week Engineer: M. Offredi (automation integration) Project: ASC-12B smart assembly cell, camera-guided gear insert Log period: Day 01 to Day 07 Document ref: WL-2026-0911-VD04 Day 01 —…

Continue reading →

Work Log: Cylinder End Stroke Cushioning on the Pallet Stacker

JUMI 2026-09-112026-09-19 Technology  cylinder cushion needle setting, cylinder end stroke cushioning, pneumatic cylinder cushion adjust

Work log — Pallet stacker project, cylinder cushioning week Engineer: A. Benetti (pneumatics commissioning) Project: PSR-900 palletising suction stacker, 900 mm lift arm Log period: Day 01 to Day 06 Document ref: WL-2026-0911-CS03 Day 01…

Continue reading →

Work Log: Design Diary for the Worm Gear Self-Locking Lift Table

JUMI 2026-09-112026-09-19 Technology  self locking worm drive design, worm gear self locking, worm gearbox no backdrive

Work log — Lift table project, worm gear drive diary Engineer: E. Kowalski (mechanical designer) Project: LFT-1400 service lift, 1,400 kg capacity, 1.1 m travel Log period: Day 01 to Day 08 Document ref: WL-2026-0911-WG02…

Continue reading →

Work Log: Tensioning and Measuring the Timing Belt Drive on the Labeller

JUMI 2026-09-112026-09-19 Technology  belt tension frequency meter, synchronous belt sag check, timing belt tension measurement

Work log — Labeller project, timing belt tension week Engineer: D. Marchetti (machine commissioning) Project: LBL-2300 hot-melt labeller, servo-fed label feed Log period: Day 01 to Day 05 Document ref: WL-2026-0911-TB01 Day 01 — morning…

Continue reading →

Design Review Minutes: Automatic Load and Unload Mechanism for the Six-Station Cell

JUMI 2026-09-112026-09-19 Technology  automatic load unload robot cell, parts feeding roller bed, robot gripper seating check

PROJECT DESIGN REVIEW — MINUTES OF MEETING Project: six-station machining cell with one robot load station Review subject: automatic load and unload mechanism, gripper sizing, cycle timing, fault recovery Date: 18 August, 10:30 to 12:20,…

Continue reading →

Design Review Minutes: Cable Tray and Cable Management for the Automation Island

JUMI 2026-09-112026-09-19 Technology  cable tray fill ratio, industrial cable tray sizing, servo cable bend radius

PROJECT DESIGN REVIEW — MINUTES OF MEETING Project: automation island with nine machines, one PLC cabinet Review subject: cable tray routing, separation, bend radius and future spare capacity Date: 4 August, 09:00 to 10:40, meeting…

Continue reading →

Design Review Minutes: Center of Gravity and Leveling Strategy for the Heavy Gantry

JUMI 2026-09-112026-09-19 Technology  cnc machine leveling procedure, gantry machine foot pad design, machine center of gravity calculation

PROJECT DESIGN REVIEW — MINUTES OF MEETING Project: heavy gantry machining centre, 6,400 kg total mass Review subject: center of gravity position, foot print, leveling feet and floor loading Date: 22 July, 10:00 to 11:50,…

Continue reading →

Design Review Minutes: Guide Rail Lubrication and Wiper Strategy for a Machining Cell

JUMI 2026-09-112026-09-19 Technology  guide block wiper and scraper, linear guide rail lubrication, rail relubrication interval

PROJECT DESIGN REVIEW — MINUTES OF MEETING Project: CNC machining cell with a long-travel gantry, X-axis 3.2 m Review subject: guide rail lubrication regime and wiper / scraper selection Date: 7 July, 13:30 to 15:20,…

Continue reading →

Posts navigation

Older posts
Newer posts
NEW

Comprehensive Conveyor Design Guide

Everything you need to know about designing efficient and reliable conveyor systems

Optimal system layout planning
Material selection guidelines
Performance optimization tips
Maintenance best practices
Get Your Guide Now
Posts You May Like
  • Temperature Sensor Selection: PT100 vs Thermocouple
  • Interlocked Machine Guard Doors: Safety That Works
  • Ball Screw Preload and Life: Choosing the Right Fit
  • Conveyor Belt Tracking and Tension: Keeping the Belt Centered
  • Hydraulic Cylinder Rod Seal Failure: Causes and Fixes
  • Pneumatic Cylinder Cushioning: Adjusting End-of-Stroke Impact
  • Gearbox Backlash: Planetary vs Worm and Rigidity
  • Shaft Coupling Selection: Jaw, Bellows, and Disc Types
  • Vacuum Generator Selection: Venturi, Flow, and Cup Sizing
  • Linear Guide Lubrication: Grease, Oil, and Relubrication Intervals
Popular 3D Download Tags
AGV (5) Apartment Building (2) AS/RS (5) Autodesk (7) Automated Warehouse (7) Automation (8) Battery Machine (3) Belt (1) Bicycle (2) Bottle Packaging (1) Brick Machine (3) Cabinet (3) Capping Machine (2) CCD Inspection (1) Compressor (6) Compressor Equipment (1) Conveyor (32) Cutting Machine (2) Diaphragm (6) Electrical Cabinet (6) Facemask Machine (16) Factory Design (11) Fitness Equipments (3) Garage (1) Hot Melting (1) Human Model (2) Industrial Equipment (2) Inventor (7) Labeling Machine (5) Lifting Equipment (4) Mine Machine (2) Packaging Machine (19) Press Machine (3) Production Line (9) Punching Machine (6) Pusher (2) Rejector (3) Residential Building (4) Retracting Conveyor (5) RGV (6) Soldering Equipment (1) Stacker Crane (6) Tapping Machine (1) Vacuum Furnace (2) Vending Machine (4)
uMCAD © 2026   Contact us   Terms & Conditions    Privacy